Walls are up

During prelim week jack and I had a free day on Wednesday so we came in to school and spent the whole day putting the walls up and fixing the roof beams. To do this we needed to ensure all walls were square and level, we used bracing and sash-clamps to assist us doing this, we used 14gauge 100mm screws to join the walls together and secure it to the floor. Once all the walls were up we could lay the roof beams across the top, we then cut them all to size so they were all at the same level. Once all roof beams were level we secured them to the walls via two 14gauge 100mm screws on each beam. During this week we used the same 100mm screws to attach the deck.deck on