During prelim week jack and I had a free day on Wednesday so we came in to school and spent the whole day putting the ...
Read more
This week we sent the trailer down to the engineering room for final fittings before Mr Breig ran it through for a W. O. F. ...
Read more
this week we had to paint the walls and battens so we can keep to our schedule and complete the house by the end of ...
Read more
Over the term break our windows had arrived, in the first week back we needed to back cut the windows so they would fit into ...
Read more
This week we had to work out the size of the door to begin constructing it, after we got the measurements we made a lintel ...
Read more
Monday 26th JuneThis week we lined the back wall with ply. Our first step was to trace the curvature of the beams onto the ply ...
Read more
This week it was time to cut out the window holes. Our very first step was to wrap the building paper around the edges of ...
Read more
Blog for the week of Monday the 5thThis week we screwed on the four ply sheets for the two side walls. Since we are doing ...
Read more
This week we made a template for the rounded edges of the roof beams, we had to be careful as to how much over hang ...
Read more
This week we have nearly finished all of the main wall framing, and also insulated the floor and nailed on the ply, we used 18mm ...
Read more